Manholes – Case Study 2

    Problem Freeze/thaw cracks and roadbed erosion Project Manhole and chimney rehabilitation Client Cincinnati Metropolitan Sewer District Location Cincinnati, Ohio Description Cincinnati MSD has been under EPA mandate to rehabilitate the sewer collection system to...

    Industrial

    Problem Preventative maintenance of industrial waste containment structure Project Preventative maintenance of industrial waste containment structure Client Bergman & Associates, New York Location Eastman Kodak, Rochester, New York Description Industrial waste...

    Environmental – Case Study 2

    ProblemSevere infiltration of lake-to-lake equalizer control pipe Project Rehabilitation of lake-to-lake equalizer control pipe ClientGeorgia Department of Natural Resources LocationTifton, Georgia DescriptionVertical overflow control pipe structure is located...

    Environmental – Case Study 1

    Problem Severe infiltration in overflow pipe – lake losing water Project Rehabilitation of stormwater overflow manhole (located in middle of lake in golf course community) Client Dogwood Lakes Community, Holmes County, Florida Location Dogwood Lakes, Holmes...

    Culverts – Case Study 2

    ProblemDamage and joint problems ProjectSeverely deteriorated corrugated metal culvert pipe in Destin, Florida ClientFlorida Department of Transportation Location Culvert pipe under US Highway 98 at Destin Bridge, Florida DescriptionCorrugated metal culvert pipe,...

    Culverts – Case Study 1

    Problem Structural problems causing roadbed erosion Project  Rehabilitation of double culvert pipe Client City of Sylvester, Georgia Location 24″ x 72′ double culvert in Sylvester, Georgia Description These culvert pipes, located under a busy highway, were...