Problem
Preventative maintenance of industrial waste containment structure
Project
Preventative maintenance of industrial waste containment structure
Client
Bergman & Associates, New York
Location
Eastman Kodak, Rochester, New York
Description
Industrial waste containment structures needed to be lined for preventive maintenance to eliminate any chance of ex-filtration of industrial chemicals into the soil/environment.
Solution
Poly-Triplex Certified Installer, Lash Contracting, used the PTLS-6800 Series Liner with the internal non-porous membrane in conjunction with a vinylester resin that is resistant to the chemicals present in the structure.
Benefit
The structures are structurally sound and the liner with the non-porous membrane is bonded to the interior of the structures, eliminating any threat of exfiltration.
Comments
Poly-Triplex provided a more permanent solution than new construction and provided a 10-year warranty. Chemical corrosion is now controlled and the threat of exfiltration is eliminated.