Problem

    Problem

    Preventative maintenance of industrial waste containment structure

    Project

    Project

    Preventative maintenance of industrial waste containment structure

    Client

    Client

    Bergman & Associates, New York

    Location

    Location

    Eastman Kodak, Rochester, New York

    Description

    Industrial waste containment structures needed to be lined for preventive maintenance to eliminate any chance of ex-filtration of industrial chemicals into the soil/environment.

    Solution

    Poly-Triplex Certified Installer, Lash Contracting, used the PTLS-6800 Series Liner with the internal non-porous membrane in conjunction with a vinylester resin that is resistant to the chemicals present in the structure.

    Benefit

    The structures are structurally sound and the liner with the non-porous membrane is bonded to the interior of the structures, eliminating any threat of exfiltration.

    Comments

    Poly-Triplex provided a more permanent solution than new construction and provided a 10-year warranty. Chemical corrosion is now controlled and the threat of exfiltration is eliminated.