Problem Manholes near collapse Project Rehabilitation of manholes near collapse Client Glynn County Engineering Services, Brunswick, GA – Robert Bowen, Engineer III Location St. Simons Island, Georgia Description Traffic on one of the island’s major streets was... by Steve Barnett | Dec 10, 2015 | Case Studies
ProblemChemical corrosion Project Manhole/vault rehabilitation – Yellowstone National Park ClientNational Park Service LocationYellowstone National Park, Wyoming DescriptionThis project, completed in 2002, included 17 manholes located within the Yellowstone... by Steve Barnett | Dec 8, 2015 | Case Studies
Problem Severe infiltration Project Severe infiltration – Boyd Lake Pump Station rehabilitation Client City of Loveland, Colorado Location Pump station beside Boyd Lake, Loveland, Colorado Description Boyd Lake Pump Station, located on the edge of Boyd Lake, is... by Steve Barnett | Dec 6, 2015 | Case Studies
Problem Severe pipeline deterioration Project 2nd generation rehabilitation – Severely deteriorated 89″ diameter concrete pipe Client City of Everett, Washington Location 89″ diameter pipeline in Everett, Washington Description This pipeline had...