by Steve Barnett | Nov 11, 2015 | Case Studies
Problem Soil erosion through cracks Project Stormwater catch basin rehabilitation Client Naval Air Station, Jacksonville, Florida Engineered Lining Systems Location Jacksonville, Florida Description Stormwater catch basin had cracks and crevices allowing infiltration... by Steve Barnett | Nov 11, 2015 | Case Studies
ProblemChemical corrosion ProjectLakeside Water and Sewer District lagoon head works rehabilitation Client Lakeside Water and Sewer District, Lakeside, Montana LocationLakeside, Montana, just south of Kalispell at Flathead Lake DescriptionThis structure was... by Steve Barnett | Nov 11, 2015 | Case Studies
ProblemSevere deterioration Project Dynamic planning for comprehensive wastewater rehabilitation project engineered by The Wooten Company – Mr. Dan Boone, Project Manager. ClientTown of La Grange, North Carolina LocationLa Grange, North Carolina... by Steve Barnett | Nov 11, 2015 | Case Studies
Problem Severe deterioration Project Dynamic planning for comprehensive wastewater rehabilitation project engineered by The Wooten Company – Mr. Dan Boone, Project Manager Client Town of La Grange, North Carolina Location La Grange, North Carolina Description... by Steve Barnett | Nov 11, 2015 | Case Studies
Problem Severe deterioration and infiltration Project Rehabilitation of severely deteriorated and structurally compromised old brick manhole with infiltration sheeting down the walls Client Fulton County Public Works Department, Atlanta, Georgia Location Atlanta,...